Notice of Study Completion

United Counties of Leeds and Grenville

Westport Storm Sewer Outfall Improvements Environmental Assessment Study

INTRODUCTION

The United Counties of Leeds and Grenville (UCLG) has completed a Schedule B Municipal Class Environmental Assessment (MCEA) (2025) Study for reconstruction and drainage improvements for the Westport Storm Sewer Outfall. The MCEA Study has evaluated alternatives and developed a Recommended Plan to address the needs within the Project Limits.

STUDY PROCESS

The UCLG EA Study was conducted as a Schedule B EA Study under the MCEA (2023). The Study considered alternatives for improvements to the storm water drainage system to provide an adequate flow route for rainfall events that exceed the capacity of the storm sewer system and replace aging infrastructure.

30-DAY PUBLIC REVIEW PERIOD OF PROJECT FILE

The Project File will be available online at: https:// https://www.leedsgrenville.com / and at the Municipal Office, located at 25 Central Avenue West, Suite 100, Brockville, ON, K6V 4N6 from June 3 until July 4, 2024 during business hours. This notice issued May 20, 2024

OUTSTANDING ISSUES AFTER PROJECT FILE REVIEW
In the event there are outstanding issues, a request to the Minister of the Environment, Conservation and Parks for an order imposing additional conditions or requiring an individual environmental
assessment may be made on the grounds that the requested order may prevent, mitigate, or remedy adverse impacts on constitutionally protected Aboriginal and treaty rights. Requests should include
your full name and contact information. Requests should also be sent to the United Counties of Leeds and Grenville by mail or by email to the two individuals noted below:

Minister
Ministry of the Environment,
Conservation and Parks
777 Bay Street, 5th Floor
Toronto, ON M7A 2J3
minister.mecp@ontario.ca

Director, Environmental Assessment Branch
Ministry of the Environment, Conservation
and Parks
135 St. Clair Avenue West, 1st Floor
Toronto, ON M4V 1P5
EABDirector@ontario.ca

Please visit the ministry’s website for more information on requests for orders under Section 16 of the Environmental Assessment Act at: https://www.ontario.ca/page/class-environmental-assessments-partii-order If there are any other outstanding concern(s), they should be directed to both individuals listed below, no later than July 4, 2024.

Steve Taylor, P.Eng.
Consultant Project Manager
BT Engineering Inc.
100 Craig Henry Drive, Suite 201
Ottawa, Ontario K2G 5W3
Phone: 613-228-4813
Email: steven.taylor@bteng.ca
Adem Adebayo., M.Eng.

Project Manager
United Counties of Leeds and Grenville
25 Central Avenue West, Suite 100
Brockville, ON K6V 4N6
Phone: 613-342-3840 ext. 2412
Email: adem.adebayo@uclg.on.ca

Information is being collected in accordance with the Environmental Assessment Act and the Municipal Freedom of Information and Protection of Privacy Act. Personal information you submit will become
part of the public record that is available to the general public unless you request that your personal information remain confidential

file:///C:/Users/admin.WESTPORT/Downloads/23-044%20Westport%20Storm%20Sewer%20Imprvments%20Study%20Completion%20May%2015-24%20QC%20(2).pdf