iCreate Base Site Logo
Westport Storm Sewer Outfall Improvements Environmental Assessment Study

Public consultation is vital to this Study. Anyone with interest in the project can provide input. An in-person Public Consultation Centre (PCC) is being held as follows:

Date:            January 30, 2024

Time:           6:00 pm to 8:00 pm (drop-in format)

Location:      Westport Community Arena – 37 Spring Street, Westport, ON K0G 1X0

For more information or if you wish to be placed on the study’s mailing or emailing contact list, contact either:

Steve Taylor, P.Eng., M.Eng.

EA Project Manager, BT Engineering Inc.

100 Craig Henry Dr., Suite 201 Ottawa, ON K2G 5W3

Phone: 613-228-4813

Email: steven.taylor@bteng.ca

Adem Adebayo., M.Eng.

Project Manager, United Counties of Leeds and Grenville

25 Central Ave. W., Suite 100 Brockville, ON K6V 4N6

Phone: 613-342-3840 ext. 2412

Email: adem.adebayo@uclg.on.ca